Belgatos Reservoir Replacement Project - Los Gatos, CA
This project involved the grading and paving of the three acre site where existing in-ground tanks were removed and replaced by above-ground tanks. This project was very difficult due to tight spaces and very deep cuts and fills that had to be done around fragile tanks. This project had very strict specifications that had to be followed so that backfill equipment did not put too much pressure on the tank walls. D&V worked with the general contractor closely to build this project in phases and to achieve a successful outcome.
Project Gallery